€3,316.78
% Offer price Regular price: €3,781.13 Normal price (12.28% saved)
Available, delivery time 5-10 days
Product information "VW TOUAREG 5.0TDi V10 04 –› Supersprint Rear exhaust R.+ L. Raci"
VW TOUAREG 5.0TDi V10 04 –› Supersprint Rear exhaust R.+ L. Racing
Informatie:
Supersprint onderdeel: Rear exhaust R.+ L. Racing
Past op: VW TOUAREG 5.0TDi V10 04 –›
Supersprint nummer: 244206
ALTERNATIVE
To be installed as a kit with 887719 or 887715 or 887729.
compatible with the OEM catalytic converter
OEM
Claimed data:
Horsepower 450 Hp at 6000 rev/min
Torque 620 Nm at 2250 rev/min
Actual data:
Horsepower 448,2 Hp at 5880 rev/min
Torque 664 Nm at 2865 rev/min.
Supersprint:Turbo downpipes
Metallic cats
Centre pipes kit 242313
Rear muffler 242306
Tail tip 242127
Actual data:
Horsepower 458,4 Hp at 5585 rev/min
Torque 671,3 Nm at 2725 rev/min.
Stock Vs Supersprint
Login
Manufacturer Info
For more than 55 years, the Italian Supersprint has been the premium exhaust manufacturer of exhaust systems. This Italian family business designs, develops and produces extremely high quality exhausts through generations of knowledge and expertise. Supersprint sports exhausts are made of high quality stainless steel, with the outlets a perfect fit, and a sporty but not too loud sound. Supersprint exhausts were built using superior components and production methods to meet the strict TÜV and ISO 9001 certification standards.
Supersprint delivers exhausts specifically made for many different types of cars.